Looking for something similar? Contact Us
We were asked to provide a PV system for this exclusive girls private school in Hertfordshire. The school had previously investigated many different options with other contractors but finally approved the AAC proposal. The system was designed and installed by AAC onto the sports hall roof in September 2015 comprising of 182 panels rated at 245w each giving a system size of 44.5kW on a 3 phase system.
Contact us using the details below or fill out the form and we'll be straight in touch.
Find out more about AAC Group and the complementary services we offer: